A model for sustainable conservation

The story of the Kent Barn Conversion

A Grade II listed timber-framed structure dating back to the late 16th century – begins with a site left disused for over 30 years and a previously refused planning application. Bringing the historic building back to life presented a whole new set of challenges: navigating strict heritage constraints, overcoming severe Flood Zone 3 risks, and addressing significant structural deterioration, all while satisfying Maidstone Borough’s rigorous rural planning policies. By raising the structure above flood levels, repairing decayed timbers with a sensitive dwarf-wall intervention, and minimising external changes, the project secures a long-term future for the barn without sacrificing its historic character.

Sensitive design for the modern climate era

The finished home achieves an EPC rating of B, an Environmental Impact Rating of A, and cuts annual carbon emissions by nearly 90% compared to an average property – a testament to how sensitive design can adapt our past for what needs to come.